:: HOME
:: ENERGY SECTOR
:: NGPES
:: NAM THEUN 2
:: UPDATES
:: FAQ / HELP
:: LINKS
Nam Theun 2 >> Environmental Assessment and Management Plan (EAMP)
Documents courtery of NTPC - ©NTPC
Table of Contents
Preface
[164 KB]
Chapter 1: Project Background
[364 KB]
Chapter 2: Analysis of Alternatives & Project Description
[3 MB]
Chapter 3: Assessment of Environmental Impacts
Part A
[2.1 MB]
Part B
[4.3 MB]
Part C
[1.6 MB]
Chapter 4: Assessment of Social Issues
[1.1 MB]
Chapter 5: Public Consultation & Disclosure
[264 Ko]
Chapter 6: Environmental Management Plan
[396 KB]
Conclusion
[164 KB]
Annex A: References
[252 KB]
Annex B: Contributors to the EAMP
[136 KB]
Annex C: Project Key Technical Data
[100 KB]
Annex D: Technical Drawings of Project Infrastructure
[3.6 MB]
Annex E: Hydrological Data
[512 KB]
Annex F: Simulated Dam Operations
[556 KB]
Annex G: Water Quality Modelling Assumptions and Results
[408 KB]
Annex H: Forest & Vegetation Types
[480 KB]
Annex I: Natural Habitats Accounting
[3.4 MB]
Annex J: Mammal & Bird species of the NNT Area
[408 KB]
Annex K: Fish species
[128 KB]
Annex L: Head Construction Contractor's Environmental Requirements
[332 KB]
Annex M: Pest Management Plan
[388 KB]
Annex N: Public Consultation and Disclosure Events
[144 KB]
Annex O: Environmental & Social Panel of Experts, Dam Safety Review Panel & International Advisory Group
[188 KB]
© Copyright 2004 | Powering Progress | All Rights Reserved